Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Method Statements

We undertake full method statements for each job combining a list of existing and established method statements such as for the use of scissor lifts as well as project and location specific method statements. In total the basic structure of a method statement is as such:

1.0 Information Used
2.0 Project Scope
3.0 Site Programme\Schedule
4.0 Labour
5.0 Plant & Equipment
6.0 Material
7.0 First Aid Coverage
8.0 Method
9.0 Risk Assessment
10.0 Standard Method Statements

Standard method statements include:

Boom Lift Painting (General)
Building Site Final Clean Up Permit To Work Form
Cherry Picker Power Tools
Cut-Off Metal Saw Rigging Safety
Forklift Roofs (Working On)
Front End Loader Safety Harnesses
Grinder Scaffolding
Heights Scissor Lift
Hazard Inspection Form Sharps Disposal
Incident Report Form Trucks - Loading and Unloading
Job Safety Analysis Worksheet Welder - Electric
Ladders Welder - Gas
Manual Handling Winch Safety

We are happy to work closely with principal contractors and clients to help them meet both their statutory provisions as well as their Health and Safety requirements under the CDM Regulations.


DM Steelworks Ltd - Unit H - Braintree Industrial Estate - Braintree Road - Ruislip - Middlesex - HA4 0EJ
Tel: 020 8864 5364 - Fax: 020 8423 8887 - E-mail: sales@dmsteelworks.co.uk
Structural Steelwork - Mezzanines - Primary Steelwork - Secondary Steelwork - Stairs - Portal Frame Buildings - Trellis Frames
London - Surrey - Kent - Essex - Hertfordshire - Middlesex - Buckinghamshire - Berkshire - Thames Valley - South East
Harrow - Stanmore - Kenton - Northolt - Greenford - Wembley - Willesden - Edgware - Ruislip - Northwood - Watford - Ealing